Assistance Document for
Nonattainment Area New Source Review
and
Prevention of Significant Deterioration
Preliminary Draft February 1997
This document is the cumulative result of hours of preparation and review by numerous
people within the Illinois Environmental Protection Agency (Illinois EPA). Although, it
was a group effort by the entire Permit Section, the contributions by the following
authors of the principal chapters is gratefully acknowledged:
| Part I: |
Frequently Asked Questions |
Jim Ross |
Permit Section |
| Part II: |
Flow charts |
Bob Smet |
Permit Section |
| Part III: |
Examples |
Joy Majumder |
Permit Section |
Finally, the tedious task of reviewing drafts and suggesting improvements to this
guidance was conducted with particular concern and dedication by the New Source Review
Manager Chris Romaine. A special note of thanks is extended to those individuals.
Donald E. Sutton
Permit Section Manager
Table of Contents
Preface
Guidance Organization
Introduction and Overview
Part I - NSR Q & A
Answers to Frequently Asked Questions Regarding NSR and PSD
- What is New Source Review?
- What is PSD?
- What are some of the differences between nonattainment NSR and PSD?
- What is a "netting exercise"?
- How do you determine the contemporaneous time frame for netting?
- What are contemporaneous emission decreases and when are they needed?
- What are emission offsets and when are they needed?
- What is the difference between BACT and LAER?
- Do I include fugitive emissions when determining the emissions change from proposed
project?
- What is the correct way to classify or refer to different changes at a source?
- For the Chicago ozone nonattainment area, what constitutes a new major source or major
modification?
- Can a source be subject to nonattainment NSR and PSD both?
- What is a "Sham" permit?
- What is "debottlenecking"?
- What does "relied on" mean in regards to creditable emissions increases and
decreases in a netting exercise and what are it's implications?
- What do the terms "synthetic minor" and "natural minor" generally
mean?
- What is a PSD increment?
- When is a netting exercise required for PSD and nonattainment NSR?
- What criteria do you use to determine if two plants which are close by and related
should be treated as the same source or separate sources for purposes of NSR?
- Does one ever need to go beyond the contemporaneous time period to consider past
emissions increases?
Part II - Flow Charts
Flow Chart 1 - Source Type/Applicability Determination
Flow Chart 2 - Proposed Source
Flow Chart 3 - Nonattainment NSR
Flow Chart 4 - PSD Determination - Attainment Area
Flow Chart 5 - Net Emissions Increase
Flow Chart 6 - Contemporaneous Period Determination
Part III: Examples
Example 1: Project is neither Major nor Major Modification
Netting Exercise - Example 1
Example 2: Project is neither Major nor Major Modification
Example 3: Proposed Project itself is not Major but constitutes a Major Modification
Example 4: Proposed Project itself is Major but not a Major Modification
Netting Exercise - Example 4
An Example of Compliance by existing source
Certification of Compliance
An example of Analysis of alternative
Analysis of Alternatives
[Table of Contents]
[Preface]
[Part I - NSR Q & A]
[Part II - Flow Charts]
[Part III: Examples]
|