This Fact Sheet Summarizes
|
In 1996, the DePue Group (Horsehead Industries, Inc.; Mobil Oil Corporation, and Viacom International Inc.) investigated sediments in the south ditch between the former New Jersey Zinc/Mobil Chemical site and DePue Lake. See map. This fact sheet discusses the results of that investigation and the risk assessment based on those results.
In 1995, the DePue Group and the State of Illinois signed an interim consent order in which the DePue Group agreed to investigate properties that may have been affected by past industrial operations at the New Jersey Zinc/Mobil Chemical site. The consent order required the DePue Group to conduct an accelerated investigation of south ditch sediments, because limited sampling by the Illinois Environmental Protection Agency (Illinois EPA) and U.S. Environmental Protection Agency (U.S. EPA) indicated that the sediments contained high levels of metals.
The south ditch sediments investigation had two goals.
The depth and breadth of the unnatural sediment were determined by a combination of reviewing aerial photographs, visual observation of changes in sediment color and the use of a ten-foot probe. The concentrations of metals were measured by collecting both surface samples and samples at depth of the unnatural sediment. These samples were analyzed for the metals of most concern at the New Jersey Zinc/Mobil Chemical site and the analytical results compared with results from samples collected from Turner Lake (also known as Mud Lake.) Turner Lake was chosen for comparison, because it has not been affected by past operations at the New Jersey Zinc/Mobil Chemical site.
Fourteen transects were drawn across the south ditch. The investigation determined that the unnatural sediment depth in the middle of each transect ranged approximately from three to seven feet with the deeper part being near DePue Lake. The estimated volume of unnatural sediment is 7,900 cubic yards. Table 1 compares the range of metal concentrations in south ditch unnatural sediment to the range of metal concentrations in Turner Lake sediment.
| Table 1 Comparison of South Ditch Sediment and Turner Lake Sediment Metal Concentrations |
||
|---|---|---|
| Metals | Range of South Ditch Sediment Concentrations mg/kg* |
Range of Turner Lake Sediment Concentrations mg/kg* |
| Arsenic |
7.8 - 82.0
|
6.9 - 10.3
|
| Barium |
193 - 4,140
|
140 - 150
|
| Beryllium |
0.38 - 1.9
|
0.83 - 0.88
|
| Cadmium |
32.4 - 910
|
3.4 - 8.0
|
| Chromium |
6.2u** - 78.2
|
34.5 - 47.7
|
| Cobalt |
8.1 - 70.2
|
9.7 - 10.1
|
| Copper |
144 - 97,700
|
36.1 - 46.1
|
| Lead |
125 - 3,440
|
36.9 - 55.7
|
| Manganese |
433 - 3,130
|
524 - 621
|
| Mercury |
0.20 - 4.6
|
0.17u** - 0.20u**
|
| Nickel |
11.6 - 60.3
|
34.3 - 41.2
|
| Selenium |
0.57 - 4.6
|
0.48 - 0.82
|
| Silver |
1.4u** - 144
|
1.0u** - 1.2u**
|
| Vanadium |
5.0u** - 38.0
|
23.8 - 28.6
|
| Zinc |
3,840 - 204,000
|
163 - 370
|
| * mg/kg = milligrams/kilogram or parts per million ** "u" after a number means that the metal was undetected at the detection limit of the equipment. The mumber preceding the "u" is the detection level of the equipment. |
||
The purpose of the risk assessment was to evaluate the unnatural sediments pose an ecological or human health risk from short term exposure. Risks that might be from long term exposure to the ditch sediments will be evaluated in the overall investigation of the entire site.
The DePue Group evaluated the ecological risk by testing the effect of sediments on two benthic organisms (small organisms that live at the bottom of a stream) that would probably be found in an environment like the ditch if unnatural sediments were not present. Two organisms, midge larvae and scud, were chosen, because one or more of their life stages is spent within sediment. These organisms are important, because they are food for larger organisms such as fish.
The midge and scud were placed in containers with eight samples of south ditch sediment and two samples of Turner Lake sediment. One hundred percent of the midge in seven of the ditch samples and 85% of the midge in the other ditch sample died in four days. One hundred percent of the scud in all ditch samples died within four days. For comparison, 22% and 35% of the midge and 22% and 23% of the scud died within four days in two samples of Turner Lake sediment.
These ecological risk assessment results indicate that the south ditch sediment is acutely toxic to midge and scud and probably to other benthic organisms. Due to the lack of benthic organisms and therefore the lack of a food source for fish, it is unlikely that fish would live solely in the south ditch.
The human health assessment was conducted by evaluating the effect metal concentrations found in the south ditch sediment would have on a child trespasser playing in the ditch and a construction worker digging in the ditch sediment. Both of these assessments assumed a short term exposure to the concentrations fo metals found solely in the ditch. Since diet, occupation, and lifestyle (e.g. some people smoke and others do not) vary from person to person, the amount of metals that a person may be exposed to outside of the ditch vary and so were not included in this risk assessment.
In order to estimate the quantity of metal entering the body of a child playing in the ditch, a number of reasonable assumptions about the maximum exposure of the child were made including the following:
*The child is between six and 12 years old and weighs 70 pounds.
*The child plays in the ditch area no more than four hours a day, 50 days per year for six years.
Using calculations approved by the U.S. EPA and the Illinois EPA, the maximum levels of metals in the south ditch sediment exceed child trespasser screening levels for arsenic, copper, and lead. See Table 2. What this means is that although there may be no immediate threat from a small number of exposures, there is concern for a child trespasser who meets the description and who is exposed to the unnatural sediment for four hours a day for 50 days per year for six years, assuming that the ditch is dry during the exposure period.
| Table 2 Comparison of Maximum Metal Concentrations in Unnatural Ditch Sediment with Screening Levels for Five Metals |
||||||
|---|---|---|---|---|---|---|
| Metals | Maximum Concentrations in South Ditch Sediments | Screening Levels2 mg/kg1 |
Frequency of Screening Level Exceedance in All Unnatural South Ditch Sediment Samples | |||
| 0 - 6 inches from surface | All depths | Child Trespasser | Construction Worker | Child Tresspasser | Construction Worker | |
| Arsenic |
28.4
|
82.0
|
55
|
61
|
3/37
|
2/37
|
| Cadmium |
845
|
910
|
1,200
|
200
|
0/37
|
29/37
|
| Copper |
97,700
|
97,700
|
47,000
|
8,200
|
10/37
|
26/37
|
| Lead |
1,740
|
3,440
|
400
|
400
|
28/37
|
28/37
|
| Zinc |
204,000
|
204,000
|
350,000
|
61,000
|
0/37
|
26/37
|
| 1 mg/kg = miligram/kilograms or parts
per million 2 The DePue Group developed the child trespasser screening levels using Illinois EPA and U.S. EPA approved calculations. The construction worker screening levels were developed by the Illinois EPA for residential and industrial/ commercial properties and have been adopted into the Illinois Administrative Code. They are referred to as Tiered Approach to Corrective Action Objectives or TACO. Screening levels for a child are different from construction worker screening levels, because it is assumed that the child's exposure is for four hours a day/50 days a year for six years, whereas the construction worker's exposure is for 30 days out of a six-week period during one year. The construction worker's exposure also differs in that, unlike the child, the worker may be excavating or in other ways disturbing the sediment causing more soil particles to be airborne and thus more metal bearing dirt to be inhaled and/or ingested. |
||||||
This scenario is characterized by short term direct contact with soil by workers excavating or in other ways disturbing the unnatural sediment.
The DePue Group obtained the screening levels for a construction worker from an Illinois EPA table calculated to protect construction workers exposed to these metal concentrations 30 days out of a 42day period during one year. The metal concentrations in the south ditch unnatural sediment exceeded the Illinois EPA arsenic, cadmium, copper, lead, and zinc screening levels for construction workers, See Table 2. This means that there is concern for construction workers who may work in the unnatural ditch sediments without adequate health and safety protection.
The DePue Group is completing a study of possible alternatives (called a feasibility study) for the ditch and will propose one of these alternatives as the remedy. When the Illinois EPA and the DePue Group agree on a remedy, this proposed remedy (called a proposed plan) and the feasibility study will be submitted to the public for comment. The Illinois EPA will make the final decision on the remedy after carefully considering all public comments
Repository and future administrative record file location: The project repository, which contains the Phase 1 investigation work plan and other project documents, is located in the Selby Township Library in DePue. The local location for the administrative record file will also be at the Selby Township Library. The administrative record is a file of documents upon which site decisions about remedies will be based.
Contacts: If you have questions about the project you may contact:
| Kurt Neibergall Office of Community Relations Illinois EPA 1021 N. Grand Ave. E. Box 19276 Springfield, Illinois 62794-9276 Phone: (217) 785-3819 |
Richard Lange Project Manager Illinois EPA 1021 N. Grand Ave. E. Box 19276 Springfield, Illinois 62794-9276 Phone: 815/223-6836 |
The DePue Group has asked that the name of their contractor be placed on Illinois EPA's fact sheets so the public can contact the DePue Group if they so desire. The DePue Group's contractor is:
James Frank
Frank & Cowles Inc.
Environmental Consultants & Engineers
7226 N. Walnut Street Rd.
Springfield, II 62707
217/487-7686
Community Relations |
| About Community Relations |
| Staff Directory |
| Fact Sheets |
| Copyright © 1996-2011 Illinois EPA | Agency Site Map | Privacy Information | Kids Privacy | Web Accessibility | Agency Webmaster |