As potable water is transported after treatment to the user, opportunities
exist for unwanted substances to contaminate it. Water supplies must protect
the water from contamination in the distribution system by maintaining a minimum
pressure of at least 20 psi, providing a chlorine residual, developing and implementing
a cross-connection control program, and providing separation from sources of
sanitary contamination including sanitary sewers, storm sewers, drains, private
sewage disposal systems and sources of hydrocarbons.
This FAQ document has been developed by the Bureau of Water of the Illinois
Environmental Protection Agency in order to increase awareness of the water
main protection requirements from sewers by answering frequently asked questions.
Water mains must be protected from sanitary sewers, storm sewers, combined sewers,
house sewer service connections, drains, and septic fields according to the
requirements stated in the Agency Rules For Public Water Supplies (formerly
Technical Policy Statements); the formal citation is: Title 35, Subtitle F,
Chapter II, Parts 651-654). A copy of the applicable sections is printed on
pages 4 and 5 of this handout.
- Does the water main have to be separated ten feet
horizontally from the sewer, if the sewer is constructed with water
main equivalent pipe?
- If local conditions prevent a lateral separation
of ten feet, what alternatives are available?
- How is Agency approval obtained for deviations from
the horizontal and vertical separation requirements?
- How is the distance between pipes measured?
- When local conditions prevent ten feet of horizontal
separation can a casing pipe be used?
- If local conditions prevent a separation of ten ffet
between a water main and a forcemain can the two pipes be located closer
together?
- If the invert of the sewer is 18 inches above the
crown of the water main, is the water main properly protected?
- What type of casing pipe is acceptable at water and
sewer crossings?
- Can the storm sewer be constructed with reinforced
concrete pipe with a flexible gasket joint meeting ASTM C361 or ASTM
C443 as an alternative to constructing the storm sewer with water main
equivalent pipe at locations where it is not possibe to meet the separation
requirements?
- Can the water main and sewer be installed in the
same casing pipe when boring under roads, railroad tracks, streams,
or other similar situations?
- Does the water main have to be ten feet from a manhole?
- What is the separation requirement between water
mains and sptic fields?
- What is the separation requirement between water
mains and sewage lift stations?
- Do the same horizontal and vertical separation requirements
apply to water service lines?
- Does a polyethylene pipe have to be protected from
sewers when using a directional drilling technique to install the water
main at least 18 inches below a sewer, if the material between the invert
of the sewer and the crown of the water main is not disturbed?
- What action must be taken if, during the course
of construction, existing utilities, water or sewer lines, are uncovered
in unexpected locations which would interfere with the permitted and
approved construction?
|
1. Does the water main have to be separated ten feet
horizontally from the sewer, if the sewer is constructed with water main equivalent
pipe?
Yes, unless local conditions prevent it. The water main must be located at
least ten feet horizontally from any existing or proposed drain, storm sewer,
sanitary sewer, combined sewer, or sewer service connection, unless local conditions
prevent a lateral separation of ten feet.
2. If local conditions prevent a lateral separation of
ten feet, what alternatives are available?
If it is not possible to obtain ten feet separation the Agency may approve
construction in which the water main invert must be 18 inches above the crown
of the sewer. In parallel situations where it is not possible to obtain the
lateral or vertical separation, then the Agency may approve construction in
which the sewer is constructed of water main equivalent pipe and pressure tested
to the maximum expected surcharge head before backfilling.
3. How is Agency approval obtained for deviations from
the horizontal and vertical separation requirements?
Agency approval is obtained during the construction permit application process.
The construction Page 2 documents must clearly show those locations where the
required horizontal and vertical separation cannot be provided. On the back
of the Schedule B - Water Main Construction form or on an attached sheet indicate
the location(s) where the separation requirements are not met, the reason that
proper separation cannot be provided, and how the water main will be protected.
The construction permit, which lists the approved plans that clearly detail
the situation(s) and indicate the alternative protection, serves as the Agency's
acceptance of the deviation(s).
4. How is the distance between pipes measured?
The distance between pipes is measured edge to edge.
5. When local conditions prevent ten feet of horizontal
separation can a casing pipe be used?
No, casing pipe can only be used at crossings where the vertical separation
requirement is not met.
6. If local conditions prevent a separation of ten feet
between a water main and a forcemain can the two pipes be located closer together?
No, the exception criteria for gravity sewers do not apply to forcemains. A
horizontal separation of ten feet must be maintained in all instances.
7. If the invert of the sewer is 18 inches above the
crown of the water main, is the water main properly protected?
No, when the water main crosses below a sewer, the sewer must be constructed
with water main equivalent pipe or else either pipe must be installed in a casing.
The protection must extend on each side of the crossing until the normal distance
from the water main to the sewer or drain is at least ten feet. In addition,
the water main must be located at least 18 inches below the sewer. This 18 inches
is a structural protection to prevent the sewer from settling and breaking the
water main.
8. What type of casing pipe is acceptable at water and
sewer crossings?
If the invert of the water main is not 18 inches above the crown of the sewer
when the pipes cross, a casing pipe can be installed around either the water
main or sewer in lieu of constructing the sewer with water main equivalent pipe.
The casing pipe must be a material that is approved for use as water main. Concrete
is not an acceptable encasement. The casing must extend on each side of the
crossing until the normal distance from the water main to the sewer or drain
is at least ten feet. For example, 30 feet of casing would be required for a
6-inch water main crossing an 8-inch sewer at a 45 degree angle.
9. Can the storm sewer be constructed with reinforced
concrete pipe with a flexible gasket joint meeting ASTM C361 or ASTM C443 as
an alternative to constructing the storm sewer with water main equivalent pipe
at locations where it is not possible to meet the separation requirements?
In parallel situations where local conditions prevent a ten foot separation
the answer is no. At crossings, the answer is yes. Storm sewer constructed with
reinforced concrete pipe is not an Page 3 approvable alternative when the storm
sewer is parallel to a water main. At crossings when the invert of the water
main is not 18 inches above the crown of the storm sewer, the storm sewer can
be constructed with reinforced concrete pipe using flexible gaskets instead
of providing a casing pipe or constructing the storm sewer with water main equivalent
pipe.
10. Can the water main and sewer be installed in the
same casing pipe when boring under roads, railroad tracks, streams, or other
similar situations?
No, the water main and sewer must be installed in separate casing pipes, at
least ten feet apart, to meet the sanitary protection requirements.
11. Does the water main have to be ten feet from a manhole?
No, the water main should be located as far as possible from manholes. The
water main must not pass through or come into contact with a manhole.
12. What is the separation requirement between water
mains and septic fields?
Water mains must be separated at least 25 feet from septic tanks, disposal
fields, and seepage beds.
13. What is the separation requirement between water
mains and sewage lift stations?
Water mains must be separated at least 25 feet from a sewage lift station.
14. Do the same horizontal and vertical separation requirements
apply to water service lines?
Yes; locate water service taps on a water main so that either the ten foot
horizontal separation or 18 inch vertical separation above sanitary sewers,
storm sewers, combined sewers, drains, and sewer service connections is provided.
For additional information on protection of water service lines refer to the
Illinois Plumbing Code or contact the Illinois Department of Public Health.
15. Does a polyethylene pipe have to be protected from
sewers when using a directional drilling technique to install the water main
at least 18 inches below a sewer, if the material between the invert of the
sewer and the crown of the water main is not disturbed?
Yes; the water main protection requirements still apply, regardless of the
technique used to install the water main.
16. What action must be taken if, during the course
of construction, existing utilities, water or sewer lines, are uncovered in
unexpected locations which would interfere with the permitted and approved construction?
The water main protection requirements still apply. Take necessary action
to provide the protection options as described in the Agency rules at part 653.119.
(See below) Protective measures as detailed in the ‘Standard Specifications
for Water and Sewer Main Construction in Illinois' are also generally acceptable.
Contact the Permit Section for approval of changes.
For further information, please contact the IEPA, Division of Public Water
Supplies, Permit Section.
Section 653.119 Protection of Water Main and Water Service Lines (From
Title 35, Subtitle F, Chapter II)
Water mains and water service lines shall be protected from sanitary sewers,
storm sewers, combined sewers, house sewer service connections and drains as
follows:
a) Water Mains:
1) Horizontal Separation:
A) Water mains shall be laid at least ten feet horizontally from any existing
or proposed drain, storm sewer, sanitary sewer, combined sewer or sewer service
connection.
B) Water mains may be laid closer than ten feet to a sewer line when:
- i) local conditions prevent a lateral separation of ten feet;
- ii) the water main invert is at least 18 inches above the crown of the
sewer; and
- iii) the watermain is either in a separate trench or in the same trench
on an undisturbed earth shelf located to one side of the sewer.
C) Both the water main and drain or sewer shall be constructed of slip-on or
mechanical joint cast or ductile iron pipe, asbestos-cement pressure pipe, prestressed
concrete pipe, or PVC pipe meeting the requirements of Section 653.111 when
it is impossible to meet (A) or (B) above. The drain or sewer shall be pressure
tested to the maximum expected surcharge head before backfilling.
2) Vertical Separation:
A) A water main shall be laid so that its invert is 18 inches above the crown
of the drain or sewer whenever water mains cross storm sewers, sanitary sewers
or sewer service connections. The vertical separation shall be maintained for
that portion of the water main located within ten feet horizontally of any sewer
or drain crossed. A length of water main pipe shall be centered over the sewer
to be crossed with joints equidistant from the sewer or drain.
B) Both the water main and sewer shall be constructed of slip-on or mechanical
joint cast or ductile iron pipe, asbestos-cement pressure pipe, prestressed
concrete pipe, or PVC pipe meeting requirements of Section, 653.111 when:
- i) it is impossible to obtain the proper vertical separation as described
in (A) above; or
- ii) the water main passes under a sewer or drain.
C) A vertical separation of 18 inches between the invert of the sewer or drain
and the crown of the water main shall be maintained where a water main crosses
under a sewer. Support the sewer or drain lines to prevent settling and breaking
the water main.
D) Construction shall extend on each side of the crossing until the normal
distance from the water main to the sewer or drain line is at least ten feet.
b) Water Service Lines:
1) The horizontal and vertical separation between water service lines and all
storm sewers, sanitary sewers, combined sewers or any drain or sewer service
connection shall be the same as water main separation described in (a) above.
2) Water pipe described in (a) above shall be used for sewer service lines
when minimum horizontal and vertical separation cannot be maintained.
c) Special Conditions - Alternate solutions shall be presented to the Agency
when extreme topographical, geological or existing structural conditions make
strict compliance with (a) and (b) above technically and economically impractical.
Alternate solutions will be approved provided watertight construction structurally
equivalent to approved water main material is proposed.
d) Water mains shall be separated from septic tanks, disposal fields and seepage
beds by a minimum of 25 feet.
e) Water mains and water service lines shall be protected against entrance
of hydrocarbons through diffusion through any material used in construction
of the line.
Part 8.6.5 Force mains (From the "Recommended Standards for Water Works")
There shall be at least a 10 foot horizontal separation between water mains
and sanitary sewer force mains. There shall be an 18 inch vertical separation
at crossings. (Agency note: The water main is to be located above the force
main at the crossing.)
|