![]() |
![]() |
|||
Pat Quinn, Governor |
||||
|
Bureau of Water Permit InformationWater Pollution Control Permit ChecklistsState Construction and Operating PermitsBelow are checklists of the required forms and attachments that are needed for State construction and/or operating permit applications for various wastewater sources and treatment systems. The following forms are required for the construction and/or operation of an industrial treatment or pretreatment system:
The following forms are required for the construction of new or expanded municipal wastewater treatment facilities (POTW's):
The following forms are required for the construction of a sanitary sewer connection or sewer main extension:
The following forms are required for the construction of a sanitary or industrial lift station and forcemain:
The following forms are required for the construction of a new industrial wastewater source to the sanitary sewer (i.e. industrial wastewater discharge with no pretreatment):
Applications for a permit to land apply sludge for agronomic or soil amendment benefit must include:
Application for a permit to spray irrigate with treated wastewater must include the following:
National Pollutant Discharge Elimination System (NPDES) PermitsNPDES Permits are required for the discharge of wastewaters to waters of the State. Below are checklists for permit applications for different types of wastewaters. An application for a NPDES permit for a new industrial discharger must consist of the following:
An application for a NPDES permit for a new industrial discharger must consist of the following:
Applications for a NPDES permit for the discharge of treated wastewater from a municipal wastewater treatment plant must include the following:
|
| Copyright © 1996-2011 Illinois EPA | Agency Site Map | Privacy Information | Kids Privacy | Web Accessibility | Agency Webmaster |